Model NITI Aayog, 24-27 Dec, online. Write an original white paper.

India's Nuclear Programme

12 min read

On this page

Watch & explore

Start with a few high-quality videos, then read the notes below.

What is India’s 3-stage nuclear energy programme · ThePrint

Try an idea before you read. Test your understanding of India's nuclear journey through two short scenarios. Explore →

On 4 August 1956 a small reactor called Apsara, at Trombay in Mumbai, reached criticality, the start of a controlled nuclear fission chain reaction. The Bhabha Atomic Research Centre (BARC) records it as the first research reactor in Asia to do so. From there the programme grew into power stations that generate electricity, research reactors that also make isotopes for medicine, agriculture and industry, and a strategic side: tests in 1974 and 1998 and a doctrine made public in 2003.

Most of the record comes from the government itself. The Department of Atomic Energy (DAE), BARC and the Nuclear Power Corporation of India Limited (NPCIL) give the dates and figures. Releases of the Press Information Bureau (PIB) and the Ministry of External Affairs (MEA) give the tests, the doctrine and the treaty positions in official words, and NCERT’s Class XII political science books explain how India argued its case.

How did India’s atomic energy programme begin?

NCERT dates the start to the late 1940s. Its book Politics in India since Independence says the nuclear programme, begun “under the guidance of Homi J. Bhabha”, was a significant part of Nehru’s industrialisation plans, and that India wanted to generate atomic energy for peaceful purposes.

The DAE gives the official steps. The Atomic Energy Commission (AEC) was first set up in August 1948, within the Department of Scientific Research, which had been created in June 1948. On 3 August 1954 a Presidential Order set up the Department of Atomic Energy under the direct charge of the Prime Minister, to transact all government business on atomic energy, including the Central Government’s functions under the Atomic Energy Act, 1948.

A government resolution dated 1 March 1958 then set up the AEC within the department “with full executive and financial powers”, and Prime Minister Jawaharlal Nehru laid a copy of it on the table of the Lok Sabha on 24 March 1958. Under that resolution the Secretary of the DAE is the commission’s chairman ex officio, and the AEC is responsible for formulating the department’s policy.

What are India’s research reactors and centres?

BARC’s About page calls Homi Jehangir Bhabha (30 October 1909 to 24 January 1966) the “Father of Nuclear Program in India”. It says he set up the Tata Institute of Fundamental Research (TIFR) for nuclear science research in 1945, and the Atomic Energy Establishment, Trombay (AEET) in January 1954.

After Bhabha’s death in 1966, BARC says, AEET was renamed the Bhabha Atomic Research Centre. In the DAE’s Founder’s Day address of 2025, the Chairman of the AEC called him the founding director of both TIFR and AEET.

Apsara was a 1 MW pool-type reactor, with light water as both moderator and coolant, used mainly for isotope production and basic research. Its upgraded successor, Apsara-U, made its first approach to criticality on 10 September 2018.

CIRUS, a 40 MWth (megawatts thermal) reactor built in collaboration with Canada, was commissioned on 10 July 1960 and permanently shut down in December 2010. BARC says what was learnt on CIRUS about natural uranium, heavy water and reactor systems “eventually evolved into the Indian pressurized heavy water reactor programme”.

What is the three-stage nuclear power programme?

BARC gives the reason in one line: “India has limited domestic uranium resources while we have abundant Thorium.” Thorium-232 is “not a fissile material”, it explains, but by capturing a neutron it turns into uranium-233, which is. In a Lok Sabha reply released by PIB on 5 August 2026, the DAE called the plan “Dr. Homi J. Bhabha’s three-stage nuclear power programme”, “based on a closed fuel cycle”, and described its stages:

StageReactorsFuel, in the DAE’s description
FirstPressurised Heavy Water Reactors (PHWRs)Domestic natural uranium; spent fuel is reprocessed to recover plutonium
SecondFast Breeder Reactors (FBRs)Reprocessed plutonium-239, while uranium-238 is bred into plutonium-239
ThirdBreeder reactors using thoriumUranium-233 bred from thorium, with plutonium-239 as driver fuel at first

The third stage depends on the second. In the DAE’s words, “only after adequate capacity of FBRs is installed, large scale utilisation of thorium will follow.” A fast breeder reactor makes more fuel than it uses, because uranium-238 in a blanket around its core absorbs neutrons and is converted into plutonium-239.

The 40 MWth Fast Breeder Test Reactor at the Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam, went critical in October 1985, BARC says. The 500 MWe (megawatts of electricity) Prototype Fast Breeder Reactor (PFBR) at Kalpakkam, designed by IGCAR and built by Bharatiya Nabhikiya Vidyut Nigam Ltd (BHAVINI), reached first criticality on 6 April 2026, PIB reported the next day. The DAE calls it “the forerunner for the second stage”.

How much nuclear power does India produce?

NPCIL, a public sector enterprise under the DAE, builds and runs the power reactors. Its pages, read on 19 November 2026 with generation figures up to October 2026, listed 24 commercial reactors with an installed capacity of 8780 MW, leaving out RAPS-1, a 100 MW unit owned by the DAE. They are two Boiling Water Reactors (BWRs), 20 PHWRs and two VVER reactors of 1000 MW each, and NPCIL listed seven more, of 6100 MW in all, under construction.

The oldest, Tarapur 1 and 2 in Maharashtra, began commercial operation on 28 October 1969; the newest in NPCIL’s table, RAPS-7 at Rawatbhata in Rajasthan, a 700 MWe PHWR, on 15 April 2025. The DAE’s Founder’s Day address of 2025 says NPCIL generated 56,681 million units of electricity in 2024-25, the highest in its operating history.

For the years ahead, the DAE told the Lok Sabha on 5 August 2026 that installed capacity of 8780 MW would reach 22480 MW by the year 2031/32, including the 500 MW PFBR. In a second reply that day it said the Nuclear Energy Mission, announced in the Union Budget 2025-26, aims at “at least five indigenous SMRs”, or small modular reactors, and at “achieving 100 GWe nuclear power generation capacity by 2047”, with Rs. 20,000 crore allocated for SMRs.

Safety is overseen by the Atomic Energy Regulatory Board (AERB), constituted on 15 November 1983 under the Atomic Energy Act, 1962. The second reply also says the SHANTI Act, 2025, notified on 21 December 2025, gives the AERB statutory status and opens the sector to public and private participation under licence, “while retaining sovereign control”.

What were the tests of 1974 and 1998?

NCERT records India’s first nuclear explosion in May 1974: “When India conducted its first nuclear test, it was termed as peaceful explosion.” India, the book adds, “argued that it was committed to the policy of using nuclear power only for peaceful purposes.” The test came in a difficult period at home, NCERT says, with high inflation after the oil shock that followed the Arab-Israel War of 1973.

On 11 May 1998 the Prime Minister announced: “Today at 1545 hrs., India conducted three underground nuclear tests in the Pokhran range.” The government called them “contained explosions like the experiment conducted in May 1974.” A DAE press statement of 24 September 2009 counts five tests in all, on 11 and 13 May 1998, at the Pokhran range in Rajasthan.

The government gave security as the reason. Its statement of 11 May 1998 said it was “deeply concerned, as were previous Governments, about the nuclear environment in India’s neighbourhood”, and NCERT’s Contemporary World Politics says the decision to test was “justified by the Indian government in terms of safeguarding national security.” NCERT records that Pakistan soon followed, that “the international community was extremely critical”, and that sanctions on both countries were later waived.

What is India’s stated nuclear doctrine?

The doctrine was made public after the Cabinet Committee on Security (CCS) met on 4 January 2003. The Prime Minister’s Office release of that day summed it up in these points:

  • “Building and maintaining a credible minimum deterrent”
  • A posture of “No First Use”: nuclear weapons “will only be used in retaliation against a nuclear attack on Indian territory or on Indian forces anywhere”
  • Retaliation to a first strike “will be massive and designed to inflict unacceptable damage”, and can only be authorised by the civilian political leadership through the Nuclear Command Authority
  • “Non-use of nuclear weapons against non-nuclear weapon states”, keeping the option of retaliating with nuclear weapons against a major biological or chemical attack on India or Indian forces anywhere
  • Strict export controls, participation in the Fissile Material Cutoff Treaty negotiations, and “continued observance of the moratorium on nuclear tests”
  • “Continued commitment to the goal of a nuclear weapon free world, through global, verifiable and non-discriminatory nuclear disarmament”

The release says the Political Council of the Nuclear Command Authority, chaired by the Prime Minister, is “the sole body which can authorize the use of nuclear weapons”. An Executive Council, chaired by the National Security Advisor, gives it inputs and carries out its directives. On 4 March 2020 the MEA told the Lok Sabha: “There has been no change in India’s nuclear doctrine.”

What is India’s position on the NPT and the CTBT?

After China’s nuclear tests in October 1964, NCERT says, the five nuclear weapon powers “tried to impose the Nuclear Non-proliferation Treaty (NPT) of 1968 on the rest of the world.” Its Contemporary World Politics explains that countries that “had tested and manufactured nuclear weapons before 1967 were allowed to keep their weapons”, while the others “were to give up the right to acquire them.”

NCERT says India “always considered the NPT as discriminatory and had refused to sign it”, since such treaties “were selectively applicable to the non-nuclear powers and legitimised the monopoly of the five nuclear weapons powers.” For that reason, it says, India opposed the indefinite extension of the NPT in 1995 and refused to sign the Comprehensive Test Ban Treaty (CTBT).

On the test ban, the government said on 11 May 1998 that India “would be prepared to consider being an adherent to some of the undertakings in the Comprehensive Test Ban Treaty”.

In a Rajya Sabha answer of 22 December 2005, the MEA noted that the treaty enters into force only when all 44 states in its Annex II, India among them, sign and ratify it. “India has stated that it will not stand in the way of the Entry into Force of the Treaty,” the answer said, adding that India observed the treaty’s spirit “by maintaining the unilateral moratorium on nuclear explosive testing.”

What changed in 2008 for civil nuclear cooperation?

The MEA records two decisions in 2008. On 1 August the International Atomic Energy Agency (IAEA) adopted an India Specific Safeguards Agreement. On 6 September the External Affairs Minister, Pranab Mukherjee, announced that the Nuclear Suppliers Group (NSG) had “adopted a statement on civil nuclear cooperation which will enable India to resume full civil nuclear cooperation with the international community to meet its energy and developmental requirements.”

Mukherjee traced the process to the Joint Statement of 18 July 2005 by Prime Minister Manmohan Singh and President George Bush. On 10 October 2008, at a ceremony in Washington, India and the United States signed what the MEA calls the 123 Agreement, on cooperation in peaceful uses of nuclear energy. Mukherjee called it “the first step to civil nuclear co-operation and trade between India and the USA.”

In a Rajya Sabha reply released by PIB on 2 April 2026, Minister of State Dr Jitendra Singh said the 2008 agreement and those that followed “enabled import of fuel for use in reactors under IAEA safeguards”. As of that date, he said, sixteen reactors with a capacity of 6380 MW were running on imported fuel under IAEA safeguards, and nuclear capacity had grown from 4020 MW in 2007-08 to 8780 MW.

Students who want to test one energy question, such as what reaching the 2047 target would take, can build the case from dated public numbers in a white paper of their own at Model NITI Aayog, One Young India’s simulation of policy work.

Sources

  • NCERT, Politics in India since Independence, Class XII, Chapter 4, “India’s External Relations”, Reprint 2026-27, pages 68 and 69. Used for: Nehru, Bhabha and the programme from the late 1940s; China’s tests (1964); the NPT (1968); the oil shock after the war of 1973; the explosion of May 1974; the NPT extension (1995) and the CTBT; the tests of May 1998, the reaction and the sanctions.
  • NCERT, Contemporary World Politics, Class XII, Chapter 5, “Security in the Contemporary World”, Reprint 2026-27, pages 69 and 77. Used for: the NPT of 1968 and the 1967 line; the government’s reason for the 1998 tests.
  • Department of Atomic Energy, “Atomic Energy Commission”, page last updated 16 April 2026, read 19 November 2026 (AEC, August 1948; Department of Scientific Research, June 1948; DAE, 3 August 1954; resolution of 1 March 1958, laid on 24 March 1958).
  • Department of Atomic Energy, “History”, page last updated 29 August 2023, read 19 November 2026 (Atomic Energy Act, 1948; the Presidential Order of 1954; the resolution of 1958).
  • Department of Atomic Energy, “Founder’s day 2025 Address by Chairman, AEC & Secretary, DAE”, page last updated 6 November 2025 (Bhabha as founding director; 56,681 million units in 2024-25).
  • Bhabha Atomic Research Centre, “About us”, read 19 November 2026 (Bhabha, 1909 to 1966; TIFR, 1945; AEET, January 1954; renamed after 1966; Apsara, 4 August 1956; Apsara-U, 10 September 2018; CIRUS, 10 July 1960, shut down December 2010; FBTR, October 1985; the three-stage programme).
  • Nuclear Power Corporation of India Limited, “About NPCIL” and “All Plants”, read 19 November 2026, generation figures to October 2026 (24 reactors, 8780 MW; Tarapur 1 and 2, 28 October 1969; RAPS-7, 15 April 2025; seven reactors under construction).
  • Atomic Energy Regulatory Board, “About Us”, read 19 November 2026 (constituted 15 November 1983 under the Atomic Energy Act, 1962).
  • PIB, Prime Minister’s Office, “Announcement by the Prime Minister” and press statement, 11 May 1998 (three tests that day; the experiment of May 1974; neighbourhood; the CTBT).
  • PIB, Prime Minister’s Office, “Cabinet Committee on Security reviews progress in operationalizing India’s nuclear doctrine”, 4 January 2003.
  • MEA, Rajya Sabha Unstarred Question No. 3260, “CTBT”, answered 22 December 2005.
  • MEA, “Statement by Minister of External Affairs Shri Pranab Mukherjee on the final outcome of the meeting of the Nuclear Suppliers Group”, 6 September 2008 (Joint Statement of 18 July 2005; IAEA agreement of 1 August 2008).
  • MEA, “Remarks by External Affairs Minister Shri Pranab Mukherjee at the signing ceremony of the 123 Agreement between India and USA in Washington”, 10 October 2008.
  • PIB, Department of Atomic Energy, “Press Statement by Dr. Anil Kakodkar and Dr. R. Chidambaram on Pokhran-II tests”, 24 September 2009 (five tests on 11 and 13 May 1998).
  • MEA, Lok Sabha Unstarred Question No. 2072, “Change in Nuclear Policy”, answered 4 March 2020.
  • PIB, Department of Atomic Energy, “Parliament Question: Impact of Indo-US Nuclear Agreement”, Rajya Sabha reply, 2 April 2026 (the 2008 agreement; 6380 MW on imported fuel; 4020 MW in 2007-08 and 8780 MW).
  • PIB, Department of Atomic Energy, “Historic Milestone: India’s 500 MWe Prototype Fast Breeder Reactor Achieves First Criticality”, 7 April 2026 (PFBR first criticality on 6 April 2026; IGCAR and BHAVINI; the breeding blanket).
  • PIB, Department of Atomic Energy, “Parliament Question: Prototype Fast Breeder Reactor”, Lok Sabha reply, 5 August 2026 (the three stages; the PFBR as forerunner of the second stage; 8780 MW to 22480 MW by 2031/32).
  • PIB, Department of Atomic Energy, “Parliament Question: Deployment of Small Modular Reactors”, Lok Sabha reply, 5 August 2026 (the Nuclear Energy Mission, Union Budget 2025-26; 100 GWe by 2047; Rs. 20,000 crore; SHANTI Act, 2025, notified 21 December 2025).

Key takeaways

  • The DAE says the Atomic Energy Commission was first set up in August 1948, and the Department of Atomic Energy on 3 August 1954, under the direct charge of the Prime Minister.
  • BARC dates Apsara’s criticality to 4 August 1956, the first for a research reactor in Asia, and the commissioning of CIRUS, built in collaboration with Canada, to 10 July 1960.
  • The three stages run from natural uranium in PHWRs to fast breeder reactors and then thorium; the 500 MWe PFBR reached first criticality on 6 April 2026.
  • NPCIL listed 24 operating reactors with 8780 MW of installed capacity when read on 19 November 2026; the Nuclear Energy Mission aims at 100 GWe by 2047.
  • NCERT says the May 1974 test was termed a peaceful explosion and records tests in 1998; the 2003 CCS release lists a credible minimum deterrent and no first use.
  • NCERT says India considered the NPT discriminatory; on 6 September 2008 the MEA said the NSG statement would let India resume full civil nuclear cooperation.

Test yourself

When did Apsara reach criticality, and what does BARC say set it apart?

On 4 August 1956. BARC says it was the first research reactor in Asia to achieve criticality.

Which reactors carry the three stages of the programme, in the DAE’s description?

Pressurised heavy water reactors fuelled by natural uranium, then fast breeder reactors using plutonium recovered from their spent fuel, and, once enough breeder capacity is installed, reactors using uranium-233 bred from thorium.

How many power reactors did NPCIL list as operating in November 2026, and with what capacity?

Twenty-four commercial reactors with an installed capacity of 8780 MW, a count that leaves out RAPS-1, the 100 MW unit owned by the DAE.

How was the test of May 1974 described, according to NCERT?

NCERT says it was termed a peaceful explosion, and that India argued it was committed to the policy of using nuclear power only for peaceful purposes.

What does the posture of no first use mean in the 2003 release?

That nuclear weapons will only be used in retaliation against a nuclear attack on Indian territory or on Indian forces anywhere.

What did the IAEA adopt for India on 1 August 2008?

An India Specific Safeguards Agreement. The External Affairs Minister noted it on 6 September 2008, when he announced the NSG’s statement on civil nuclear cooperation with India.

Frequently asked questions

Why does India’s plan lean on thorium?

BARC says India has limited domestic uranium and abundant thorium, and that the three-stage programme was planned to use that thorium. Thorium is not fissile, but by capturing a neutron it turns into uranium-233, the fuel of the DAE’s third stage.

Has India joined the NPT?

No. NCERT says India “always considered the NPT as discriminatory”, refused to sign it, and opposed the treaty’s indefinite extension in 1995.

Where does India stand on the CTBT?

NCERT says India refused to sign it. On 22 December 2005 the MEA told the Rajya Sabha that India, keeping a unilateral moratorium on nuclear explosive testing, would not stand in the way of its entry into force.

Who checks the safety of India’s nuclear plants?

The Atomic Energy Regulatory Board, constituted on 15 November 1983 under the Atomic Energy Act, 1962. The DAE told the Lok Sabha on 5 August 2026 that the SHANTI Act, 2025 gives it statutory status.

Try it

India's Nuclear Programme Interactive

Test your understanding of India's nuclear journey through two short scenarios.

1Which statement best reflects the rationale behind India's first underground nuclear test in 1974?

2What is a key feature of India's nuclear doctrine as formally articulated in 2003?

Take this further

How does India make policy?

The Model NITI Aayog self-paced course: 41 chapters, about 18 hours of study, on how India makes policy, from the policy cycle and writing a white paper to the economy, the Union Budget and governance. It comes with the live Model NITI Aayog programme.

Learnacy Essential adds feedback from an AI writing coach, submission to The OYI Review, 10 self-paced courses, World 101’s member tools and the 3D labs. Publication is not guaranteed. See what membership includes

Or create a free account to draft in the Writing Studio, explore World 101’s map and open the 2D version of every lab. Create a free account